Meaning
Verification procedure performed to ensure a pre-certified radio module operates within specified parameters when installed in a final product. Performing a host integration check identifies unintentional shielding or reflection issues that might alter the radio footprint. Engineers measure spurious emissions to verify the new enclosure does not leak radiation.
Verification Sequence
Testing begins with a physical inspection of the antenna placement and lead dressing. After powering the system, the host integration check monitors the current draw and heat dissipation to ensure the module stays within its rated thermal envelope. Signal integrity is measured at the data interface to confirm that host processor noise does not degrade receiver sensitivity.
Test Scope
Performance varies according to the materials used in the final housing. If the product uses a metal casing instead of plastic, the host integration check becomes a tool for determining if an external antenna is necessary. It confirms that the system works.
Document Requirement
Documentation of this process is necessary for the final product declaration. Although the module is already certified, the host integration check provides the data needed to show the combined system meets the requirements of the relevant standards. This step prevents the cost of full system re-certification by identifying minor issues early in the design cycle.
A record of these tests is kept in the technical file for review by auditors. The report includes spectral plots and the firmware versions used.