Meaning
Financial investments required to develop a new hardware product cover the non recurring engineering activities that occur before mass production. This nre cost includes circuit design, mechanical tooling, software development and the creation of test fixtures. These expenses are paid once and do not scale with the number of units produced.
The budget for these items is finalized during the initial project planning phase.
Tooling Development
Plastic injection molds and metal stamping dies represent a major portion of the capital outlay. Because nre for these tools is high, the design must be frozen and validated before the steel is cut. Any change to the physical shape after the mold is built results in additional costs and delays.
Certification Expense
Regulatory testing for radio compliance and safety standards is a fixed cost for each product variant. Paying the nre for a certified laboratory ensures the device can be legally sold in specific markets. This process includes electromagnetic compatibility testing and environmental stress screening.
Amortization Strategy
Project managers often distribute the upfront costs over the expected lifetime volume of the product to determine the total cost per unit. If the nre is high and the volume is low, the price per piece must increase to recover the investment. A high volume product can absorb millions in development costs with only a small impact on the final bill of materials.
Calculating the break even point is the primary method for justifying the start of a new hardware program.