Meaning
Geological and geotechnical sampling performance is represented by the ratio of retrieved core length to the total drilled run. For projects demanding precise rock quality designation, core recovery represents the primary metric to assess sample integrity before laboratory analysis begins. The calculation divides the total length of recovered cylindrical samples by the physical length of the drilling run.
Measurement Protocol
Drill operators record the start and end depths of each run to establish the baseline denominator of the ratio. After extraction from the core barrel, workers lay the retrieved segments in a core box and measure the continuous solid cylinders. This step requires careful handling of fractured zones to ensure that loose pieces are not lost or artificially compressed.
Highly fractured zones require separate measurements that must be carefully compiled to avoid double-counting or inflating the physical recovery percentage.
Technical Influence
Subsurface stability calculations rely on the accurate estimation of rock strength parameters. When core recovery falls below eighty percent, the resulting laboratory test results might not represent the actual rock mass conditions. This discrepancy forces engineers to apply conservative design margins in foundation designs.
Boundary Condition
Highly fractured formations or extremely soft soils often cause the core catcher to fail. Under such extreme conditions, the core recovery metric loses its precision due to the washing away of fine materials by the drilling fluid.