Meaning
Manufacturing overhead includes the cumulative expenses required to remove all previous materials and documents from a workspace before a new production run begins. The line clearance cost accounts for the time and supplies used to ensure no cross-contamination occurs between different batches of electronic components. It represents a part of the total cost of ownership for high-mix production environments.
Labor Component
Skilled technicians must perform a systematic sweep of every station and storage bin. This portion of the line clearance cost involves checking for stray screws or labels. It ensures the environment meets the requirements of the next assembly stage.
Material Waste
Purging the feeders and cleaning the dispensers consumes raw materials that cannot be recovered. A line clearance cost includes the value of the chemical solvents and the discarded components used to prime the machines for the new job. These items are necessary to reach the required level of cleanliness.
Throughput Impact
The time spent during the transition reduces the total number of units the facility can produce in a shift. Calculating the line clearance cost must factor in the lost opportunity of having the machines offline. Optimization of the changeover process is the primary way to lower this financial burden.