Meaning
Delegation of a portion of the evaluation work transfers the testing to an external specialist laboratory when the primary test house lacks the specific equipment or accreditation required. Defining the subcontracted test scope is necessary to clarify the division of responsibility between the primary contractor and the subcontractor. This division ensures that all required regulatory testing is executed in compliance with national standards.
Vendor Capability
Some measurements require highly specialized chambers, such as those used for over-the-air cellular testing or high-frequency millimeter-wave radars. When a test house encounters these unique requirements, the subcontracted test scope outlines which tests will be run by the external lab. The primary lab remains responsible for the quality of the final consolidated report.
Data Transfer
Transferring test samples and baseline configurations between facilities requires structured coordination. Technical files must be securely shared so that the subcontractor understands the correct power settings and software commands of the device. Poor transfer of this information leads to incorrect test configurations and delayed reports.
Quality Control
The primary laboratory must audit the credentials of the subcontracting facility to ensure they hold valid ISO/IEC 17025 accreditation. This oversight is necessary to prevent the regulatory dossier from being invalidated by the certification body due to an unapproved test laboratory. All results must be reviewed and signed off by the primary lab’s technical manager before delivery.
This verification guarantees that the subcontracted data integrates perfectly with the primary test report and passes agency review on the first attempt.