Meaning
Verification sequences confirm that a large production jig has survived shipment without losing its internal alignment. A tooling transfer acceptance test compares the post-shipment state of the fixture to its original factory measurements. This process identifies any structural shifts caused by vibration or temperature changes during transport.
Successful completion of the test allows the production team to start work with confidence in the tooling accuracy.
Verification Protocol
Technicians use laser trackers to measure a set of reference points on the tool before it leaves the supplier. These same points are measured again once the tool arrives at the new facility. The comparison of these two datasets reveals any deformation in the frame.
Handover Data
Documentation includes the original measurement report and the new results from the site of installation. These records provide a clear history of the tool condition for quality audits.
Project Success
Meeting the specified tolerances ensures that the assembly line will produce parts that fit together correctly. Failure to pass the test results in a hold on production until the tool is repaired. This verification step prevents the waste of expensive materials in the early stages of a product launch.
A signed acceptance report is necessary before the tool is released for use in the manufacturing process.