Meaning
Initial statistical evaluations assess short-term process performance during pre-production equipment qualification runs. Initial tooling trials for battery enclosure seals use a preliminary capability study to verify whether new press tooling can meet engineering tolerance limits before full production release. The evaluation boundary stops when long-term production factors such as shift changes and raw material lot variations enter the data set.
Sample Protocol
Sequential production of thirty to one hundred consecutive parts forms the data baseline without process adjustments. Execution of a preliminary capability study relies on strict control of setup parameters to isolate inherent machine capability from operator variability. Non-normal data distributions require mathematical transformation prior to calculating initial capability metrics.
Performance Metric
Short-term indices Ppk and Pp measure actual performance against engineering specification widths. Low values during a preliminary capability study indicate centering errors or excessive variation in stamping presses. Tool adjustments correct mean offsets before committing equipment to formal PPAP submission.
Approval Barrier
Engineering sign-off documents require preliminary indices to exceed minimum threshold values of 1.67 for critical dimensions. Completion of a preliminary capability study provides the statistical justification for transferring tooling from the supplier build site to the volume production facility. Failure to achieve target indices blocks tooling sign-off and forces re-machining of die cavities.